This checklist is general information about construction contracts, not legal advice and not a substitute for an attorney. Contract law varies by state — always have a licensed attorney review your agreement before signing.
Most homeowners read a construction contract the way they read software terms of service: skim, sign, hope. But unlike software, a builder agreement can put hundreds of thousands of dollars at risk. These are the ten clauses worth reading slowly — what each one means, why it matters, and what to ask for instead.
1. No firm completion date
A contract that promises work will take “approximately” six months — or lists a start date but no finish date — gives you no leverage when the project drags. Without a date, “delayed” has no real meaning, and you can’t plan a move, a lease ending, or rate locks around it. Ask for: a specific substantial-completion date, plus a daily credit (for example $100–$250 per day) if the builder runs past it for reasons within their control.
2. Price-escalation clause
Some contracts let the builder raise the price if material or labor costs climb — sometimes with no cap and no proof required. You can sign at $400,000 and end up owing $460,000 with little recourse. Ask for: a fixed price. If the builder won’t agree, insist on a cap for increases (for example, no more than 5%), documented proof of the added cost, and your right to cancel if an increase exceeds the cap.
3. Large non-refundable deposit
Deposits above 10–20% of the project cost — or deposits labeled “non-refundable” no matter what happens — put your money at risk before any work exists. If the builder walks away or goes under, that money is typically gone. Ask for: a deposit of 10% or less, the rest tied to completed milestones, and refund terms if the builder defaults. Note that several states cap deposits by law, so check your state’s contractor licensing board.
4. Gutted warranty
Watch for warranties that last only 90 days, exclude “workmanship,” or make you pay for the builder to fix their own mistakes. A warranty that covers almost nothing isn’t really a warranty — it just looks like one. Ask for: at least a one-year workmanship warranty, written claim instructions, and a response-time commitment (for example, defects acknowledged within 14 days).
5. Vague allowances
Allowances are placeholder budgets for items you’ll pick later — flooring, fixtures, appliances. When they’re set unrealistically low, you blow past them and pay the difference plus the builder’s markup. Ask for: allowance amounts based on real quotes rather than guesses, a written list of exactly what each allowance covers, and any markup on overages stated upfront.
6. No inspection rights
Some builder contracts bar you from bringing your own inspector, or allow visits only “by appointment” that never seem to get approved. You need independent eyes on the work at the stages where mistakes get buried — foundation, framing, and pre-drywall. Ask for: the right to hire a licensed inspector at standard construction stages, with reasonable notice to the builder.
7. One-sided default terms
Read what happens when each side fails to perform. Many contracts let the builder keep your deposit and sue for more if you cancel — but give you almost nothing if they abandon the job or stop showing up. Ask for: symmetric remedies: if the builder defaults, your deposit comes back plus your documented out-of-pocket costs.
8. No lien waivers
If your contractor doesn’t pay their subcontractors or suppliers, those parties can file a lien against your home — even if you paid the contractor in full. Lien waivers are the document that prevents this. Ask for: signed lien waivers from the contractor and all subcontractors and suppliers with every payment, plus a final waiver when the project is complete.
9. Arbitration-only disputes
Many contracts require binding arbitration and waive your right to go to court — sometimes in the builder’s home county, with you splitting the arbitrator’s fees. Arbitration isn’t automatically bad, but a one-sided clause can price you out of ever bringing a claim. Ask for: a neutral venue both sides agree on, and fee terms that don’t make small-but-real disputes economically impossible to pursue.
10. Verbal promises not in writing
The upgrade the salesperson promised, the timeline the superintendent mentioned, the “don’t worry, we always do that” — if it isn’t written into the contract, it effectively doesn’t exist when there’s a dispute. Ask for: every promise, allowance amount, and timeline in writing, signed by both sides, before you sign the agreement itself.
What to do with this list
Print it, open your contract next to it, and check off each item. If you find three or more red flags — or even one big one, like an uncapped escalation clause — slow down and get the language fixed before you sign. Most builders expect some negotiation; the clauses above are negotiated every day.
Want this done for you, line by line?
Contract X-Ray scans your specific agreement against a 12-point checklist — every clause above and more — and tells you in plain English what’s normal, what’s risky, and exactly what to ask for before you sign.
Get your contract scanned — $149Automated review, not legal advice. Always have a licensed attorney review your contract before signing.